OUTDOOR FURNITURE · NETHERLANDS

Cut landed cost 23% on a four-container furniture order

23%

landed cost

4

suppliers consolidated

38 days

door to door

The challenge

A garden furniture brand was buying four SKUs through a Dutch trading company at a 30% premium, shipping FOB from three different ports and paying three sets of documentation and clearance fees.

What we did

We re-sourced three of the four SKUs to two factories in Foshan already running the same powder-coating line, kept the fourth supplier, and moved the whole programme to DDP with consolidation in Ningbo.

The result

Landed cost fell 23% at the same retail price. One shipment, one customs entry, one delivery appointment. The client now reorders twice a year on the same template.


DRINKWARE · UNITED STATES

Took a drinkware line from 4.1 to 4.7 stars

4.7★

average rating

0.6%

return rate

100%

leak tested

The challenge

An Amazon seller had a good product with a bad review profile: leaking lids and crushed retail boxes after FBA handling, driving a 6% return rate.

What we did

We introduced pre-shipment inspection to AQL 1.5, added a 100% leak test at the factory, redesigned the retail carton with a corrugated insert, and moved to FBA prep in China so cartons arrived compliant.

The result

Returns fell to 0.6%. The listing recovered to 4.7 stars over five months and the client added two SKUs on the same protocol.


INDUSTRIAL CASTINGS · AUSTRALIA

Removed a nine-week delay from a casting programme

9 wks

recovered

2

qualified foundries

1,400

units delivered

The challenge

A single-source foundry in Ningbo stopped production for a furnace rebuild two weeks before a 1,400-unit order was due, with no second source qualified.

What we did

We audited the incumbent, qualified a second foundry in Wenzhou against the same drawings, split the tooling across both, and moved 600 units to the new supplier within eleven days.

The result

The order shipped nine weeks earlier than the revised single-source plan. Both foundries remain qualified, and the client now runs dual sourcing as standard.

WHAT THESE HAVE IN COMMON

None of them were solved by a lower price

Every case above started with a structural problem: incentives, quality control, or a single point of failure. Price was the symptom, not the cause.

A second source

Dual sourcing removes the single point of failure that turns a factory problem into a missed season.

Inspection as a control

Withholding the balance until inspection passes changes the factory’s behaviour more than any contract clause.

Consolidation

One shipment instead of four removes cost and coordination risk at the same time.

Cost structure

We price the whole landed cost, so savings are measured where they actually land.

NEXT STEP

Tell us what you need. We will tell you what it costs.

Send one product link or a photo. Within five working days you get factory options, unit prices, tooling, lead time and a landed cost to your door.

Request a quote

Quote request